Pressure wash brick or cinder block
The first step is to pressure wash your brick or cinder block. Once the surface has air dried (2-day minimum), we will razor scrape any previous paint that is peeling, remove loose caulk, and re-caulk as needed. Gaps in mortar are tuck pointed and filled in.